Home » Support » Resources

Download List

From core optical components to complete machine assembly, the company has achieved full-chain self-control. Through the deep integration of intelligent production lines and digital management systems, it ensures product consistency and supply chain resilience. The vertical manufacturing model not only significantly enhances cost control capabilities, but also endows the enterprise with flexible production capabilities to respond quickly to customized demands, providing customers with highly adaptable solutions.
 

Download List

download

LONYING Product Catalogue.pdf

7438KB

2026-03-30

download

2026 English Product Catalogue

6472KB

2026-03-04

FAQ

  • What are the payment methods?

    The common payment methods are as follows: A certain percentage of the payment is made upon signing the contract, and the full amount is paid before the goods are dispatched.
  • Are product demonstrations or prototype tests provided?

    We strongly recommend that you visit our showroom or conduct on-site inspections of installed cases. For key clients and projects, we can negotiate and arrange for prototypes to be brought to your site for a short-term test to ensure that the equipment fully meets your actual operational requirements. 
  • How long does it take from placing an order to completing the production of the equipment?

    For the standard model, the regular delivery period is 30-45 working days. The cycle includes production, assembly, complete machine testing and calibration. The cycle for customized products or bulk purchases will be longer accordingly. The sales manager will provide an accurate schedule after the contract is signed. 
  • How long is the warranty period? What does the warranty cover?

    We offer a 12-month warranty for standard products, starting from the date of equipment acceptance and qualification. The warranty covers faults caused by material or manufacturing defects. We will provide free repair or replacement. 
  • How long does the period from placing an order to equipment installation take?

    For standard models, the regular delivery time is 10 to 20 working days. The period includes production, assembly, complete machine testing and calibration. The cycle for customized products or bulk purchases will be longer accordingly. The sales manager will provide an accurate schedule after the contract is signed. 

Quick Links

Product Category

Contact Us

Copyright© 2026 Qingdao Laoying Haina Opto-electronic Environmental Protection Group Co., Ltd. All Rights Reserved.   Sitemap | Privacy Policy